60–75%
faster deployment
Process-simulation result · Greenfield reference case · Not a real or measured figure


Simulation Results
Every figure, with the basis behind it. The percentages are results of process simulation against a defined reference case, not real or measured figures; no Oil Grid installation has yet been built.
Every figure below moves the same needle governments and operators care about most: capital at risk, time to first revenue, and the footprint left behind. The percentages are "up to" values — results of process simulation from assumed inputs against a defined reference case, not real or measured figures; no Oil Grid installation has yet been built. These are upper-bound results: actual results can vary widely from field to field, and may be much lower. The rest are properties or intents of the design. Tap ⓘ on any tile for the basis behind it.
60–75%
faster deployment
Process-simulation result · Greenfield reference case · Not a real or measured figure
Up to70%
lower CAPEX
Process-simulation result · Greenfield reference case · Not a real or measured figure
Up to70%
lower OPEX
Process-simulation result · Greenfield reference case · Not a real or measured figure
Up to80%
energy consumption
Process-simulation result · Greenfield reference case · Not a real or measured figure
Up to60%
smaller footprint
Process-simulation result · Greenfield reference case · Not a real or measured figure
Up to90%
production lost to downtime
Process-simulation result · Greenfield reference case · Not a real or measured figure
1/3
design-to-implementation cycle — typically 1–2 years
Process-simulation result · Greenfield reference case · Not a real or measured figure
100%
HSE compliant
24/7
intelligent AI control
Any well
high, medium or low pressure, any crude type
Secured
against theft or destruction, by design
0
surface tanks
All percentages are "up to" values — upper-bound results of process simulation and engineering calculation from assumed inputs and operational experience — not real or measured figures. No Oil Grid installation has yet been built. They are illustrative and have not been independently audited or validated through a completed project. They are calculated on a virgin (greenfield) field with no existing supporting utilities — no electrical substation, access roads, or gas and water supply; the advantage narrows where such infrastructure already exists, and actual results vary by site. THE OIL GRID is engineered and patented; next comes the one-time design stage — full engineering and manufacturing design, prototype testing, certification and licensing — then the first standard units are manufactured, ready for the first customer.

Start a Confidential Conversation
This page tells the story. If you want the numbers and documents behind it, your portal tier gives you exactly that — from a one-page fact sheet to detailed briefing documents, matched to who you are.